View Issue Details

IDProjectCategoryView StatusLast Update
0032639mantisbtfeaturepublic2023-06-10 03:23
Reporterpikachurus Assigned Toatrol  
PrioritynormalSeverityminorReproducibilityhave not tried
Status closedResolutionno change required 
Product Version2.25.7 
Summary0032639: 'due_date_default' for each project of mantis installation
Description

hi.

is it possible to use 'due_date_default' configuration in separate projects?

TagsNo tags attached.

Activities

atrol

atrol

2023-05-30 14:47

developer   ~0067794

Configurations can be set in database per project.
For option due_date_default, you have to use page (Manage > Configuration > Configuration Report
https://www.mantisbt.org/docs/master/en-US/Admin_Guide/html-desktop/#admin.config.intro

pikachurus,

This is not a bug or feature request for MantisBT (you are asking for help on how to configure the system). I am therefore resolving this issue as "no change required".

Please use the forums to get support on customizing and using MantisBT (refer to http://www.mantisbt.org/support.php for links and further details).